Sable Labs · Federal bid support for small business

Your Compliant RFQ Response, Delivered in 48 Hours.

You find the opportunity. We turn the solicitation into an evaluator-ready package: a requirements crosswalk that answers every line, the technical response, the FAR certifications, a priced schedule and a page-by-page quality check. You review, sign and submit.

Gap list, delivered within hours. Free on any live solicitation.
8 findings before a word was written
Two due dates in the government’s own documents
Flagged
Q&A cites a warranty not in the SOW
Flagged
Spec sheet still describes a competitor’s product
Resolved
Section 889 letter out of date
Flagged
Buy American certificate missing
Resolved
Package delivered for review
Under 4 hours

Real findings from a submitted federal quote, identifiers removed.

48 hrsfrom intake to your review copy, for RFQs under the simplified threshold
30+ rowsin the compliance crosswalk: every requirement mapped and marked Meets, Exceeds or Partial
5,000+solicitation documents read and reconciled against each other so far. Placeholders at sign-off: zero
Freegap list on any live solicitation, within hours, no commitment. That’s the first deliverable, and you keep it either way

Proof: A Federal Quote Built from a Cold Start in Under Four Hours.

A national security firm, a small business bidding its first federal product quote, had to answer a Department of Veterans Affairs RFQ for three solar-powered surveillance trailers. Same-day deadline. We reconciled eight government documents against each other, found a deadline conflict between two of them, caught Q&A answers that cited requirements not in the statement of work, and flagged a requirements list that still described a competitor’s product. Then we built the whole package.

One page of the requirements crosswalk as the client receives it: government requirement, source, offeror response, and a status column marked Meets, Exceeds or Partial, on Sable Labs letterhead
The crosswalk. One page of the 30-row crosswalk from the submitted quote. Client name, pricing, government contacts and registration identifiers redacted. Elsewhere in the full crosswalk, the warranty row is marked Partial on purpose: we don’t hide gaps, we explain them.

What stayed human: every number and every claim. The AI flagged; the client decided. The margin math showed contingency was already covered, so the quote came down without touching the margin.

A package like this typically takes a firm 30 days or more. Full case study on request. Reference available.

Open solicitationProposals due Nov 2U.S. Army Corps of Engineers, Mobile District

Live Review: A Corps of Engineers Solicitation, Read End to End.

Solicitation W9127826RA063 covers operation and maintenance of Jim Woodruff Lock and Dam and Lake Seminole on the Florida–Georgia line, a total small business set-aside. We read every document in it against every other one, and found places where they disagree.

53documents
3amendments
Freenote to each likely bidder

We sent each small business we identified as a likely bidder a free three-page note that flags the conflicts, with every line citing its source, before the deadline.

The lesson. Read every document against every other one before you price anything.

Gap note, sent free to likely bidders
53 documentsread against each other
Deadline set in “Central Daylight Time (UTC -5)”, but daylight time ends Nov 1
Flagged
Amendment 0002 restored two volume labels that 0001 had corrected
Flagged
Site visit “mandatory” in one document, “strongly recommended” in another
Flagged
Free note to each likely bidder
Before the deadline

Three of the findings, from documents current through Amendment 0003. Bidders should confirm the deadline hour with the contracting officer.

Results

What we built next for the same firm.

Opportunity screening across ~140 notices, a Navy sources-sought response, a teaming package for a guard recompete, and the paperwork that holds up before anyone asks. Hours logged against a by-hand estimate, the errors a manual read would likely have missed, and the public numbers on why bids lose.

See the results page

What a Gap List Looks Like

This is the first thing you get, before any drafting, and it’s free on any live solicitation. Below: a real one, built October 17 for a Florida SDVOSB guard firm on a live VA solicitation, 36C26026Q0900. Four government documents reconciled, 32 items, each with its source, what it means, the options and our recommendation. Six pages; the firm’s name is withheld.

Page 1 of a Sable Labs gap-and-risk list: summary tiles, our read on the opportunity, and the first items of the list
Page 1. The count (32 items: 25 resolved, 3 client decisions, 4 hard gates), our honest bid / no-bid read, and the list begins with the deadline and amendment gates.
Page 2 of the gap-and-risk list: price schedule and wage determination items with source, meaning, recommendation and status
Page 2. The price schedule the amendment changed, the hours you price versus the hours you’re paid, the wage determination and the overtime math. Each line: source, what it means for you, options, status.

We’ll also send you one note when a set-aside in your NAICS posts. No list, no spam; one line to unsubscribe.

Also in the document: a submission checklist, Part by Part, and the short list of what we need from you. Nothing gets written until the client decisions are made.

From an earlier package: eight findings on a VA product RFQ
FindingWhereWhy it mattersStatus
Synopsis and Amendment 0001 give different due datesSynopsis vs. amendment headerSubmitting to the later date can mean a late quote. Treat the earlier as binding unless the CO confirms in writing.Client Decision
Q&A cites a 5-year battery warranty that is not in the SOW or attachmentsQ&A #23, #37, #72Product carries 2 years. Mark Partial, explain, offer extended warranty as an option. Never claim 5.Client Decision
Requirements list still describes a competitor’s product tiers with the brand name deletedAttachment 2Map to the government’s stated function, not the competitor’s spec sheet. Note it in the crosswalk preamble.Resolved
10-day battery-only autonomy requested; product does 3 to 4 daysQ&A #29, #40Bundle the manufacturer’s backup generator, which the attachment itself lists as included. State the honest battery figure.Resolved
Manufacturer brochure and website disagree on panel wattage, mast operation and wind ratingExhibit A sourcesQuote the exhibit you attach and make all exhibits agree. An evaluator will catch a mismatch.Resolved
Nonmanufacturer rule exposure for a resellerFAR 52.219-33End item built in the US by a small-business manufacturer satisfies the rule without a waiver. Keep the size record in the bid file.Resolved
Section 889 letter on file is from 2022 and doesn’t list the camera modelExhibit CRejected. Request a current component-level letter naming make, model and country for each part.Confirm with Manufacturer
Buy American certificate not furnished by the governmentVolume IIIReproduce FAR 52.225-2 from the provision text, complete and sign it.Resolved

How It Works

  1. 1

    Intake, 20 Minutes

    You send the solicitation documents and answer the intake below: what you sell, past performance, certifications, your cost basis. That’s all we need to start.

  2. 2

    Gap List First, Draft Second

    Within hours you get the gap-and-risk list: conflicts between the government’s own documents, requirements you can’t meet, missing certs, unanswered Q&A. You decide what to do about each before a word of the proposal is written.

  3. 3

    The Package

    Requirements crosswalk, technical response, delivery and support plan, compliance statements, FAR certifications (Buy American, Section 889), priced CLIN schedule with options, manufacturer letters if you resell, and an internal pricing worksheet that never touches the government copy.

  4. 4

    Quality Check and Sign-Off

    Every document rendered to PDF and audited page by page: split tables, phantom pages, wrapped signature lines, leaked internal notes. You get a clean review copy, a submission email, and an open-items list. You sign and submit.

Pricing

RFQ48 hours
$1,950 flat

Simplified-acquisition RFQs and product quotes: supplies, equipment, straightforward services.

  • Gap-and-risk list
  • Requirements crosswalk
  • Technical response and price schedule
  • FAR certifications
  • PDF audit and submission email
RFP5 Business Days
$4,500 flat

Solicitations with a technical volume, past-performance volume or evaluation factors.

  • Everything in the RFQ package
  • Full technical and management volumes
  • Past-performance write-ups
  • Compliance matrix against Sections L and M
  • Three full-package change requests included
  • Final audit on the approved proposal before you submit
Bid Desk RetainerMonthly
$6,000 /month

For firms that want a bid desk without hiring one. Cancel any month.

  • Five bid responses per month, each with a complete page-by-page audit
  • Daily screening of SAM.gov set-asides in your NAICS codes and states, with a bid / no-bid score on every match
  • Two full past-performance reviews per month: what you won, what you lost, and the opportunities that went by unseen
  • Recompete calendar for every contract you hold
  • Priority turnaround

Smaller Jobs

Flat fees, the same people and the same audit, for the work around a bid.

Capability Statement2 Business Days
$450 flat

A one-page federal capability statement built from your SAM.gov record, codes, licenses and past performance. Commercial version on request.

  • Matched to your SAM.gov legal name, UEI and CAGE
  • Core competencies, differentiators and past performance
  • PDF and editable copy
See an example →
Sources-Sought Response48 hours
$750 flat

Answer a market survey so the buyer knows you before the solicitation is written, and so it stays open to small business.

  • Response letter and the government’s company forms
  • Observations on the draft requirement
  • Capability fit against the salient characteristics
See an example →
Teaming Package5 Business Days
$2,500 flat

For contracts too large to prime: a plan and the outreach to join a prime’s team as a subcontractor.

  • Incumbent and likely primes from public award data
  • The right contact at each
  • Capability statement written for primes
  • Teaming emails pitching posts you can staff
See an example →
The gap-list guarantee. The first gap list is free, before you pay anything. If you go ahead and pay the deposit, then read the full gap-and-risk list and decide not to continue, half the deposit comes back, no questions. You keep everything we sent.

50% deposit to start, balance on delivery of the review copy. Flat fees, no percentage of award. Rush orders (24 hours for an RFQ) are paid in full up front instead of by deposit, at the same flat fee. We never submit on your behalf; you sign and submit every package.

Is This for You?

  • Yes if you’re a small business, 8(a), SDVOSB, WOSB or HUBZone firm bidding set-asides without a proposal staff.
  • Yes if you resell or integrate a manufacturer’s product and need the distributor and compliance letters handled.
  • Yes if you’ve been losing bids on compliance, not capability.
  • Not yet if you aren’t registered in SAM.gov. We’ll point you to the free registration and take your first RFQ once it’s active.
  • No if you want someone to invent past performance or certify something that isn’t true. The crosswalk says Partial when it’s Partial.

Questions People Ask

Is this written by AI?

Built with it, decided by people. AI reads every document against every other document and drafts from structured intake; that’s why it’s fast. Every number, claim, and gap decision is made by a person and written down. You review and sign.

Will you make my company look like it meets everything?

No. The crosswalk says Partial when it’s Partial, with the mitigation beside it. Evaluators trust packages that are straight with them, and a claim you can’t back is how you lose a contract after you win it.

What if the deadline is tomorrow?

Rush inside 24 hours is possible for RFQs, paid in full up front at the same flat fee, if the documents are complete. If it isn’t doable well, we say so in the go / no-go reply and don’t take your deposit.

Do you submit for us?

Never. You sign, you submit, you own the relationship with the contracting officer. We give you the submission email ready to send and a checklist of what to attach.

What do I need to have ready?

Active SAM.gov registration, the solicitation documents, what you’re offering, two or three past-performance references, and your cost basis when you have it. The intake form below covers it in 20 minutes.

How do I pay?

Deposit by card or ACH when you accept the go reply; balance on delivery of the review copy. Flat fees, invoiced. No percentage of your award, ever.

Get started

Get Your Free Gap List

Three short steps. The request builds itself as you type. Send it with the solicitation documents and the gap list comes back within hours, free, no commitment.

1 The Solicitation
2 Your Firm
3 The Offer
Fill in the solicitation number to start.

Who’s Behind This

Sable Labs is a team of technology professionals who build for two worlds: government contracting and enterprise consulting. We’ve designed the systems that find federal opportunities, built the AI programs that run a national security firm’s pipeline, and shipped the software that private aviation and lending companies run their businesses on. We bring that same engineering to your bid.

Our rule on every job: the AI does the reading, the reconciling and the drafting, and a person makes every decision that spends your money, signs your name or makes a promise to a contracting officer. That’s how a package comes back fast and stays honest.